Blog

  • Panmnesia and Intel Advance CXL Rack-Scale AI Infrastructure

    Panmnesia and Intel Korea signed a memorandum of understanding to collaborate in phases on bringing CXL servers into AI data centers. The parties will use Intel Xeon platforms paired with Panmnesia’s PCIe 6.4-CXL 3.2 Fusion Switch and low-latency CXL 3.2 controller to conduct interoperability validation, performance optimization, reference architecture development, and PoC demonstrations, while exploring cooperation on rack-scale AI infrastructure.

    Source:Electronics Weekly · Read Original · 前沿热点

  • MAME at 30: Why Arcade Emulation Is Harder Than Console Emulation

    Over the past 30 years, MAME has continued to expand its support for arcade boards, revealing why high-fidelity arcade emulation is harder to achieve than console emulation. Each arcade machine uses custom CPUs, memory, graphics, and sound hardware, and even when its ROMs boot normally, that does not mean sound synchronization, input latency, and timing behavior are fully accurate. ArcadeMania integrates MAME 0.289 and can run more than 5,000 arcade games on iPhone and iPad, but users must provide their own ROMs.

    Source:SoftZone · Read Original · 前沿热点

  • Elon Musk’s Restrictions on Starshield Prompt Europe to Rethink Its US Tech Dependency

    The author argues that Elon Musk’s restrictions on Starshield’s intelligence and military services for Ukraine have prompted European policymakers to reassess the security risks of relying on US technology. The article speculates that Europe may accelerate the development of digital-sovereignty alternatives, while AI has reduced the cost of rebuilding software capabilities such as those offered by Office and Oracle, potentially causing US tech companies to lose some revenue from allied markets.

    Source:steveblank.com · Read Original · 前沿热点

  • Xiaomi Pad 9 Pro Review: An Affordable Flagship Tablet with Excellent Battery Life

    Notebookcheck reviews the Xiaomi Pad 9 Pro, an Android tablet with a 12.5-inch LCD, an 11000mAh battery, and a Snapdragon 8 Gen 5 chip. It features an aluminum alloy unibody, supports 67W wired fast charging, but performance is somewhat stagnant compared to the previous generation, and there is no 5G or GPS. It is priced from 3,799 yuan in China, while the imported version starts at US$ 615; international availability details have not yet been announced.

    Source:notebookcheck.net · Read Original · 前沿热点

  • Path Robotics Completes $300 Million Series E Funding at a $2.45 Billion Valuation

    Path Robotics has announced the completion of $300 million in Series E funding led by Georgian, valuing the company at $2.45 billion. The funds will be used to expand production, hire employees, and extend the company’s factory applications.

    Source:The MES Times · Read original · 前沿热点

  • How Much Does It Cost to Build a PC That Rivals the Nintendo Switch 2?

    Building a PC with performance comparable to the Nintendo Switch 2 is expected to cost between $800 and $1,000 in total—significantly more than the Switch 2’s $500 price. A configuration could use an RTX 3050, an Intel Core i3-12100F, and DDR4 or DDR5 memory, with the base hardware costing around $640. RAM shortages, rising hard drive prices, and fluctuations in accessory prices could push the cost even higher.

    Source:SlashGear · Read Original · 前沿热点

  • Is Jensen Huang a New Target of China’s “Honey Trap”? Article Analyzes Risks in the AI Chip Race

    The article examines whether NVIDIA CEO Jensen Huang could be drawn into the U.S.-China AI security competition due to personal relationships and stresses that strategic motives do not prove that espionage has occurred. It revisits the ancient Chinese “honey trap” strategy and similar intelligence operations during the Cold War, while citing China’s Ministry of Foreign Affairs’ denial of the related allegations and NVIDIA’s statement that it sees no reason to believe the company’s secrets have been leaked.

    Source:New Space Economy · Read Original · 前沿热点

  • Vertiv and NVIDIA Launch Integrated AI Data Center Deployment Solution

    Vertiv and NVIDIA have introduced an integrated AI data center deployment solution combining virtual infrastructure simulation with factory-built systems. The companies estimate that the solution can reduce infrastructure deployment time by up to 50% and increase cumulative AI token output by up to 30% during the first 12 months at the same installed capacity; actual results depend on project requirements and deployment conditions. Polar Data Centers is applying this model to the first 41 MW project at its Herøya AI data center campus in Norway, with the entire project planned for expansion to 100 MW.

    Source:Express Computer · Read Original · 前沿热点

  • Cloud Storage vs. Local Storage for File Backups: Pros and Cons

    The pros and cons of cloud storage and local storage for file backups depend on accessibility, ongoing costs, and reliability needs. iCloud and Google Drive support automatic syncing, cross-device access, link sharing, and collaboration, but they require a stable internet connection and are billed monthly or annually. In the United States, Apple charges $9.99 per month for 2TB of iCloud+, totaling nearly $240 over two years.

    Source:Engadget · Read Original · 前沿热点

  • Nvidia CEO Jensen Huang Resigns, CFO Colette Kress Serves as Interim CEO

    Nvidia CEO Jensen Huang resigned after disclosures of an extramarital affair and suspected ties to a Chinese spy, and will leave the board. The company appointed CFO Colette Kress as interim CEO and is considering internal and external successors. His departure could affect U.S. chip export policy toward China and coordination of the AI ecosystem led by Nvidia.

    Source:iTnews · Read original · 前沿热点